How the team works on a running plant, and checklists you can use.

How Red Tiger runs an assessment on a live plant, plus two checklists you can download.

Printed report pages, a tablet with charts, and a hard hat on a white desk

How the team works on a running plant

When the Red Tiger team arrives at the facility, the team and your operations group meet to go over the steps for the next several days. Site hazards come first. Then the plant walk.

  1. The work is on live SCADA, DCS, and EMS. Level 3.5 and down. Only OT, not IT.
  2. Passive once inside OT. The team captures traffic with the IoTSecure.io mini. No field-device scans unless operations says so, and preferably off production.
  3. Active scanning, if at all, is on computing hosts, not field devices, and only after operations has been told so the work can stop immediately.
  4. Written rules of engagement and a do-not-touch list before anyone plugs in.
  5. Six layers, from physical down to the field.
  6. Host collection with REDCAT: nothing installed, nothing written back. The team runs it on one host first so operations can see it does not change the console.
  7. You get a report, prioritized fixes, and a board briefing if you want one. Analysis is done off the plant, and the data leaves in an encrypted vault.

Checklists and white papers

Each download asks for your first name, work email, and company. One short form, then the PDF.

PDF

Fleet cyber governance checklist

Fifteen questions for cruise and fleet security leaders to ask their teams and vendors, with room to answer for two ships of the same class.

Download (PDF) · Cruise Lines and Maritime →

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.