Home / Industries / Electric Power
Electric Power · NERC CIP
Keep the lights on, and give the auditor evidence that holds up.
Generation, transmission and distribution, EMS, co-ops, and munis. The team walks a live generating station or control center the same way it walks a water plant: plant-safe, Level 3.5 and down, with operations in the room. When the work has to stand up to NERC CIP, the team maps the evidence to the standard.

The problem
CIP cares about BES Cyber Systems, Electronic Security Perimeter access points, and whether the control center and the generating station were actually looked at, on a live system, with a method that will not trip the plant. Co-ops and munis need the same plant-safe start. The findings that are common in SCADA, DCS, and operational networks still have to be written so an auditor can use them.
How Red Tiger handles it
- Step 1. A plant-safe CVA of live ICS and EMS, plus a NERC CIP CVA when the scope needs evidence mapped to CIP-005 and CIP-007. Often combined with a generating station or EMS assessment. Level 3.5 and down. Only OT, not IT.
- Step 2. Fix the immediate need: the gap that fails the audit, or the open path into the ESP.
- Step 3. 24x7 MSP + Metrics and Reports: if you want Red Tiger to stay, a small firewall and sensor go in at the plant, the team watches those assets 24x7 with the Red Tiger SOC, on the cadence you set.
Who Red Tiger works with
Generation, T&D, EMS and control centers, cooperatives, and municipal utilities. If an asset sits under CIP, the scope says so.
DOE-funded cybersecurity help for co-ops and munis
The U.S. Department of Energy’s Rural and Municipal Utility Cybersecurity (RMUC) program funds cybersecurity technical assistance for electric cooperatives, municipal utilities, and small investor-owned utilities, delivered through a not-for-profit organization that has formal partnerships with at least six eligible utilities.
Red Tiger can be the assessment, remediation, and training team inside that kind of partnership: a plant-safe assessment of the control center, substations, and SCADA, Level 3.5 and down, then fixing the immediate need, crew training with virtual labs through CambiOS Academy, and 24x7 MSP + Metrics and Reports: if you want Red Tiger to stay, a small firewall and sensor go in at the plant, the team watches those assets 24x7 with the Red Tiger SOC. DOE and the not-for-profit applicant decide who qualifies and what gets funded, not Red Tiger, but if your co-op or muni is talking with its association about RMUC, the team can join that conversation.
The DOE RMUC technical assistance opportunity, administered by ConnectWerx →